• HICOTE SP
    HICOTE SP Clean fireproof coating is a basic requirement.
    The most economical and effective Fire-resistive ever!
    New-HICOTE SP is an industry-leading steel frame fireproof material. As the constructability is outstanding and the level of dust generation is low, its quality has been recognized in line with the Green Round trend. In addition, as the adhesion intensity is excellent and the durability is semi-permanent, securing a pleasant living space.
    View View
  • HICOTE ET
    HICOTE ET HICOTE-ET will realize more than customer satisfaction. Based on the technology and know-how accumulated for 30 years, Sunghyun Chemical has developed high-temperature processing of eco-friendly mineral matters and applied the ceramic system for the first time in Korea to secure the highest heat resistance performance. With our eco-friendly products, we create pleasant living space.
    View View

Affiliates

ㆍHome > Company introduction > Affiliates > SUNGHO Co., Ltd.
Sunghyun Technology Research Center Sunhyun Perlite Co., Ltd. Sunghyun Industry Co., Ltd. Seongho CSP co., Ltd. SUNGHO Co., Ltd.  
 
 

SUNGHO Co., Ltd.

· Hyundai Information Technologies Research Center No. 2 Expansion
· Location: Hyundai Information Technologies Research Center No. 2, 71-3, Cheongdam-dong, Gangnam-gu, Seoul
· Construction Scale: Underground Floor 1 to Ground Floor 5
· Construction Structure: Reinforced
· Use: Research Center
· Date of Initiation: November 2, 2008
 

Organization Chart

 

Sungho Building and Cheongdam Building constructions

Classification Sungho Building Cheongdam Building Total
Location 71-3, Cheongdam-dong, Gangnam-gu 71-17, Cheongdam-dong, Gangnam-gu
Construction Scale Underground Floor 5 - Ground Floor 14 Underground Floor 4 - Ground Floor 6
Lot Area 1130m2 1358㎡ 2489m2
Construction Area 674m2 598㎡ 1239m2
Total Building Floor Area 12,555m2 7,474㎡ 19,504m2
Construction Structure Reinforcing concrete Reinforcing concrete
External facing Granite, pastel glass Granite, pastel glass
Use Office, neighborhood facility Office, neighborhood facility
Date of Initiation 30-June-03 30-June-03
Date of Completion 20-Oct-05 20-Oct-05